Programma Generator Sinusa

Programma Generator Sinusa Rating: 4,0/5 1945 votes

To play a constant tone, click Play or press Space. To change the frequency, drag the slider or press ← → (arrow keys). To adjust the frequency. Gear Generator is a tool for creating involute spur gears and download them in DXF or SVG format. In addition it let you compose full gear layouts with connetcted gears to design multiple gears system with control of the input/output ratio and rotation speed.

The Surveyor program consisted of seven unmanned lunar missions that were launched between May 1966 and January 1968. Five of these spacecraft, Surveyor 1, 3, 5, 6, and 7 successfully soft-landed on the lunar surface. In addition to demonstrating the feasibility of lunar surface landings, the Surveyor missions obtained lunar and cislunar photographs and both scientific and technological information needed for the Apollo manned landing program. Four spacecraft, Surveyor 1, 3, 5, and 6, returned data from selected mare sites from Apollo program support, and Surveyor 7 provided data from a contrasting rugged highland region.

For more on the individual missions, select from the list below. The Surveyor 1 Mission Mission Description Launch: 30 May, 1966 Landed: 2 June, 1966, 06:17:37 UT Landing Site: Flamsteed P (2.45°S latitude, 316.79°E longitude) In addition to proving a variety of new equipment and spacecraft design and validating the technique for landing on the Moon, Surveyor 1, the first U.S. Spacecraft to land softly on the Moon, returned a large quantity of scientific data during its first two days of operation on the lunar surface. Following its landing the spacecraft transmitted 11,240 high-resolution television pictures. Surveyor 1 completed its primary mission on July 14, 1966, after transmitting, in addition to the television pictures, data on the bearing strength, temperatures, and radar reflectivity of the Moon. Subsequent engineering interrogations of the spacecraft were conducted through January 1967. Selection of the Target Site All Surveyor landing sites, except for the last one, were selected primarily because they were being considered as Apollo landing sites.

No torrent/file links to illegal sources. No preset/sample sharing without clear proof of free source or rights. Posting FL Studio tutorials by others or yourself is usually not spam. Not giving feedback in the feedback thread within 3 days of posting a track is not cool. No asking for links. Fruity parametric eq 2 download.

The landing site selected for Surveyor 1 was in the southwest part of Oceanus Procellarum. The spacecraft came to rest within about 15 kilometers of the target point, on a flat surface inside a 100-kilometer crater, one radius from the edge of a rimless 200-meter crater. The Surveyor 2 Mission Mission Description Launch: 20 September, 1966 Surveyor 2 was intended to land in Sinus Medii, a different area of the Apollo zone.